Hydro One  Hydro OneHomeSearchSite MapContact UsIndustry Links
Hydro OneHydro One
About Hydro One Networks
Electrical Safety
Customers
Energy Efficiency Tips and Tools
Electricity Updates
Environment
In Your Community
Regulatory Affairs
Media Centre

Home > Regulatory Affairs > OEB Applications

Regulatory Affairs

Hydro One Networks Applications to the Ontario Energy Board

Information regarding Hydro One Networks' Applications to the Ontario Energy Board (OEB) is shown below. Further information on these applications can also be obtained by contacting the OEB Secretary toll-free at 1-888-632-6273 or local at (416) 481-1967. Hard copies of all of Hydro One Networks' regulatory filings noted below can also be viewed at the Ontario Energy Board's public file room.

OEB Applications Archive - 2002 to 2004


Copies of all Applications discussed below can be viewed at
:

Hydro One Networks Inc.
Regulatory Affairs
Attn: Glen MacDonald (416) 345-5913
8th Floor, South Tower
483 Bay Street
Toronto, Ontario M5G 2P5

Copies of certain Hydro One Networks' Applications and Copies of Hydro One Networks' licences and other OEB codes can also be viewed at the document repositories located in the following Hydro One Networks offices:

Hydro One Networks Offices - Document Repositories
Hydro One
Barrie Field Business Centre
45 Sarjeant Dr.
Barrie, ON
L4M 5N5
Hydro One
Dundas Field Business Centre
40 Olympic Dr.
Dundas, ON
L9H 7P5
Hydro One
Peterborough Field Business Centre
913 Crawford Drive
Peterborough, ON
K9J 3X1
Hydro One
Beachville Field Business Centre
56 Embro St
Beachville, ON
N0J 1A0
Hydro One
Sudbury Field Business Centre
957 Falconbridge Rd
Sudbury, ON
P3A 5K8
Hydro One
Thunder Bay Field Business Centre
255 Burwood Rd
Thunder Bay, ON
P7B 6T8
Hydro One
Merivale Service Centre
31 Woodfield Dr.
Nepean, ON
K2G 3Y4
Hydro One
Markham Office
185 Clegg Rd.
Markham, ON
L6G 1B7

OEB Applications

OEB Docket Number Description Status
RP-1998-0001 Hydro One Networks' 1999 Transmission and Distribution Transitional Rate Application & Prefiled Evidence
EB-2003-0031 Hydro One Networks application for a service territory change affecting Veridian Connections to permit service to two customers
EB-2004-0436 Hydro One Networks S92 Downtown Cables Application - "Leave to Construct Underground Transmission Line from John TS to Esplanade TS"
EB-2004-0451 Hydro One Networks' Application for Amendment of Existing Rate Schedule in Respect of the calculation of Retail Transmission Charges for Customers Connected to Hydro One Networks' Low Voltage System
EB-2004-0461 Hydro One Networks Application to Establish Interim Time-of-Use Rates for Demand-billed Customers
EB-2004-0476 Hydro One Networks S92 Niagara Reinforcement Project Application - "Leave to Construct Transmission Facilities in the Niagara Peninsula"
EB-2004-0545 De Beers Canada Inc., Five Nations Energy Inc., and Hydro One Networks ("Joint Applicants") - Application for "Leave to Construct and Reinforce certain transmission facilities, including all associated station upgrades"
EG-2003-0138 Hydro One Remote Communities Generation Licence Renewal Application
  • Filed with the OEB May 29, 2003
  • On October 20, 2003 the Board issued a 20-year Generation Licence, expiring October 19, 2023.
RP-1999-0057/EB-2002-0424 Hydro One Networks' proposed Equipment Compliance Process and Customer Delivery Point Performance Standards filings pursuant to requirements of the Transmission System Code
RP-1999-0057/EB-2002-0501 Joint application by Hydro One Networks Inc., Ontario Power Generation Inc. and Bruce Power L.P. for Exemption with Respect to Section 2.1.1 of the Transmission System Code
RP-2002-0101/EB-2002-0242 Hydro One Networks Application for amendments to the Transmission System Code and Customer Connection Process
  • Application filed September 27, 2001 and October 17, 2001
  • Customer Connection process filed January 30, 2002
  • On February 25, 2002 the OEB indicated that it would be initiating a proceeding to review the requested amendments and the customer connection process
  • On August 30, 2002 the Board stated that the proceeding would have two phases
  • Phase One was concluded September 24, 2003
  • OEB Decision (PDF) on Phase One issued June 8, 2004
RP-2003-0033/EB-2003-0035 Hydro One Networks Transmission Licence Renewal Application
  • Filed with the OEB February 17, 2003
  • On December 3, 2003 the Board issued a 20-year Transmission Licence ET-2003-0035, expiring December 2, 2023
  • The Board issued a revised Transmission Licence ET-2003-0035 on August 11, 2004 as a result of and simultaneous with release of its RP-1999-0057/EB-2002-0501 Decision and Order. For more information, download a copy of the EB-2002-0501 Decision and Order.
RP-2003-0033/EB-2003-0043 Hydro One Networks Distribution Licence Renewal Application
  • Application (ZIP file) filed with the OEB February 26, 2003
  • On September 29, 2004 the Board issued its Decision and Order together with Hydro One Networks' Electricity Distribution Licence - ED-2003-0043 which has been renewed for a 20-year period expiring September 28, 2024
RP-2003-0035/EB-2003-0037 Hydro One Remote Communities Distribution Licence Renewal Application
  • Filed with the OEB February 24, 2003
  • On December 24, 2003 the Board issued a 20-year Distribution Licence, expiring December 23, 2023
RP-2003-0036/EB-2003-0038 Hydro One Brampton Distribution Licence Renewal Application
  • Filed with the OEB February 24, 2003
  • On June 27, 2003, the Board issued a 20-year Distribution Licence expiring March 31, 2003
RP-2003-0038/EB-2003-0044 Hydro One Networks Section 92 Application for Leave to Construct Transmission between Hawthorne Transformer Station and Russell Transformer Station in Ottawa
  • Application filed with the OEB February 28, 2003
  • OEB Decision and Order (PDF) was issued July 10, 2003 granting Hydro One Networks leave to construct
RP-2003-0184/EB-2003-0226 Hydro One Networks application for a service territory change involving service to a new customer in Brant County Power
  • On October 6, 2003 the Board issued its Decision and Order (PDF) granting approval to amend Brant County Power's Distribution Licence.
RP-2003-0188/EB-2003-0233 Wholesale Metering Services Rebates and Exit Fees - Minister's Directive
  • The Minister of Energy on July 24, 2003 requested the OEB to review Hydro One Networks' Wholesale Metering Service Rebates and Exit Fees and to advise the Minister on its findings
  • On March 11, 2004 the OEB issued its Order (PDF)
RP-2003-0239/EB-2003-0299 Hydro One Networks Section 95 Application for Leave to Construct transmission : GTA - Parkway Station and Parkway to Richmond Hill Line
  • On December 23, 2003 the OEB issued its Decision and Order (PDF) granting Hydro One Networks an exemption from normal S92 approval requirements
RP-2004-0117/RP-2004-0118 Hydro One Networks Application for distribution rate changes to initiate recovery of regulatory assets. Rates proposed to be effective April 1, 2004.
  • OEB Decision and Order and Interim Rate Schedule (PDF) issued March 16, 2004 approving changes for distribution rates effective April 1, 2004
  • Hydro One Networks Evidence on the Regulatory Assets Review Phase II filed May 31, 2004 
  • Regulatory Assets Review - Phase II Oral hearing is scheduled for September 13, 2004
RP-2004-0180/EB-2004-0270 Distribution Business Pension Costs Deferral Account Application
  • Application and Evidence filed with the Ontario Energy Board on June 1, 2004
  • OEB Decision and Order (PDF) issued July 14, 2004

back to top

 

 

[ Printable Version ]

All contents © 2004 Hydro One Networks Inc. All rights reserved. Privacy and Terms of Use