Hydro One Networks' Bruce to Milton Transmission Reinforcement Leave
to Construct Application (EB-2007-0050) to the Ontario Energy Board (OEB)
was filed on March 29, 2007 and has been updated since that time. The
Application and Evidence in support of this Application is available in
Adobe Acrobat format. Use the jump links below to download files from
the specific Exhibits:
Exhibit
A - Administration (Updated April 24, 2008)
Exhibit
B - Prefiled Evidence
Exhibit
C - Interrogatory Responses (Updated April 10, 2008)
Exhibit J - Undertaking Responses (Updated
May 13, 2008)
Exhibit
K - Miscellaneous Exhibits (Updated June 4, 2008)
A full listing of the exhibits is provided in Exhibit
A - Tab 5, Schedule 1. (Updated April 24, 2008)
CD with all Exhibit A and Exhibit B files or hardcopy (one three-inch
binder) is also available upon e-mail request to regulatory@HydroOne.com.
CD with all Exhibit C (interrogatory responses) or a hardcopy without
large attachments (one two-inch binder and one three-inch binder) or hardcopy
with large attachments (two two-inch binders and two three-inch binders)
also available upon e-mail request to regulatory@HydroOne.com.
Hard copy of all exhibits can also be viewed at the offices of the Ontario
Energy Board (27th floor, 2300 Yonge Street, Toronto, Ontario), at Hydro
One Networks' office at 483 Bay Street, Toronto or at municipal document
repositories shown in the Ontario Energy Board Notice.
OEB Notices and filings relevant to this proceeding are:
Exhibit A - Administration
Tab_1_Schedule_1_-_Application
(Updated Nov 30 07)
Tab_2_Schedule_1_-_Summary_of_Prefiled_Evidence
(Updated Nov 30 07)
Tab_3_Schedule_1_-_Procedural_Order-Affidavits-Correspondence
Tab_4_Schedule_1_-_Notice_of_Motion
Tab_5_Schedule_1_-_Exhibit_List (Updated
Apr 24 08)
Tab 5 Schedule 2 - Witness
Panels and Responsibilities (Updated Apr 24 08)
Tab 5 Schedule 3 - Direct
Evidence of Witnesses (Updated Apr 24 08)
Tab 5 Schedule 4 - Curriculae
Vitae (Updated Apr 24 08)
Exhibit B - Prefiled Evidence
Tab_1_Schedule_1_-_Project_Location_Existing_Tx_Sys
(Updated Nov 30 07)
Tab_1_Schedule_2_-_Map_of_Existing_Facilities
Tab_1_Schedule_3_-_Need_of_Proposed_Facilities
(Updated Nov 30 07)
Tab_1_Schedule_4_-_Existing_Facilities-BruceXMilton_Schematic_Diagram
Tab_1_Schedule_5_-_Existing_Facilities-Bruce_A_TS_Schematic
Diagram
Tab_1_Schedule_6_-_Existing_Facilities-Bruce_SS_Schematic_Diagram
Tab_1_Schedule_7_-_Existing_Facilities-Milton_SS_Schematic
Diagram
Tab_2_Schedule_1_-_Description_of_Proposed_Facilities
Tab_2_Schedule_2_-_Map_Showing_Location_of_Proposed_Facilities
Tab_2_Schedule_3_-_Need_for_Proposed_Facilities
Tab_2_Schedule_4_-_Proposed_Facilities_BruexMilton_Schematic_Diagram
Tab_2_Schedule_5_-_Proposed
Bruce_A_TS_Schematic_Diagram
Tab_2_Schedule_6_-_Proposed_Facilities_Bruce_B_SS_Schematic_Diagram
Tab_2_Schedule_7_-_Proposed_Facilities_Milton_SS_Schematic_Diagram
Tab_3_Schedule_1_-_Tx_Alternatives_Considered
Tab_3_Schedule_2_-_Local_Route_Refinement_Options
(PDF 7.4 MB - Updated Nov 30 07)
Tab_4_Schedule_1_-_Project_Costs_Economics_and_Other_Public_Interest
Tab_4_Schedule_2_-_Project_Cost
Tab_4_Schedule_3_-_Project_Economics
(Updated Nov 30 07)
Tab_4_Schedule_4_-_DCF_and_Rate_Impact_Analysis
Tab_4_Schedule_5_-_Other_Public_Interest_Considersations
Tab_5_Schedule_1_-_Construction_and_Project_Admin
(Updated Nov 30 07)
Tab_5_Schedule_2_-_Project_Schedule
(Updated Nov 30 07)
Tab_6_Schedule_1_-_Other_Matters-Agreement-Approvals
(Updated Nov 30 07)
Tab_6_Schedule_2_-_The_IESO's_SIA
Tab_6_Schedule_3_-_Customer_Impact_Assessment
(PDF 4.6 MB)
Tab_6_Schedule_4_-_The_IESO's_System_Impact_Assessment
Tab_6_Schedule_5_-_OPA_Materials
(PDF 12.1 MB - High-speed Internet required)
Tab_6_Schedule_6_-_Stakeholder_and_Community_Consultation
(PDF 7.0 MB - Updated Nov 30 07)
Tab_6_Schedule_7_-_Aboriginal_Engagement_Process
Tab_6_Schedule_8_-_Enironmental_Assessment_Status
Tab_6_Schedule_9_-_Land_Matters
Tab_6_Schedule_10_-_Legal_Agreements-Forms
Tab_6_Schedule_11_-_Land_Maps
(Updated Nov 30 07)
Tab_6_Schedule_11_-_Map_Wellington_North
Tab_6_Schedule_11_-_Maps_Brockton
Tab_6_Schedule_11_-_Maps_East_Garafraxa
Tab_6_Schedule_11_-_Maps_East_Luther_Grand_Valley
Tab_6_Schedule_11_-_Maps_Erin
Tab_6_Schedule_11_-_Maps_Halton_Hills
(Updated Nov 30 07)
Tab_6_Schedule_11_-_Maps_Hanover
Tab_6_Schedule_11_-_Maps_Kincardine
Tab_6_Schedule_11_-_Maps_Milton
(Updated Nov 30 07)
Tab_6_Schedule_11_-_Maps_Southgate
Tab_6_Schedule_11_-_Maps_West_Grey
Exhibit C - Interrogatory Responses
Tab 1 - Board Staff
Tab 2 - Pollution Probe
List_One
- filed March 7, 2008 (ZIP file - Updated April 10, 2008)
List_Two
- filed March 17, 2008 (ZIP file - Updated April 10, 2008)
List_Three
- filed March 20, 2008 (ZIP file)
List_Four
- filed March 25, 2008 (ZIP file - Updated April 10, 2008)
List_Five
- filed March 25, 2008 (ZIP file - Updated April 10, 2008)
Tab
3 - FALLIS FALLIS and McMILLAN - filed March 12, 2008 (ZIP file)
Tab 4 - Chris Aristides Pappas
Tab_5_-_Saugeen_Ojbway_First_Nation
(SOFN) - filed March 11, 2008
Tab 6 - Energy Probe
Tab_7_-_Power_Workers'_Union
(PWU) - filed March 20, 2008 (ZIP file)
Tab_8_-_Metis_Nation_of_Ontario
- filed March 20, 2008 (ZIP file)
Tab_9_-_The_Ross_Firm
- Hydro_One_Networks - filed March 25, 2008 (ZIP file - Updated
April 10, 2008)
Schedule
1 - Attachment A (ZIP file - 14 MB - High-speed Internet Required)
Tab_10_-_The_Ross_Firm_-_IESO
- filed March 25, 2008 (ZIP file)
Tab_11_-_The_Ross_Firm_-_OPA
- filed March 25, 2008 (ZIP file)
Tab_12_-_Powerline_Connections
- filed March 25, 2008 (ZIP file)
Exhibit J - Undertaking Responses
List of Undertaking Responses
(Excel file - Updated May 13, 2008)
Filed Undertaking Responses
(ZIP file - Updated May 13, 2008)
Exhibit K - Miscellaneous Exhibits
List of Miscellaneous
Exhibits (Excel file - Updated June 4, 2008)
Filed Miscellaneous Exhibits
(ZIP file - Updated June 4, 2008)
Back to Top
Bruce to Milton Early
Access Application (EB-2007-0051) filed with the OEB March 30, 2007
(PDF 1.2 MB - Updated May 3, 2007) for authority to provide early access
to land related to an application for leave to construct a new 500 kV
transmission line between Bruce and Milton.
- OEB Notice of Application - English,
issued April 12, 2007 (PDF)
- OEB
letter clarifying its role with respect to the application and the
process of the application, issued May 25, 2007 (PDF)
- Response
to Motions filed with the OEB June 18, 2007
- Hydro One Networks' July 23, 2007 Interrogatory
Responses to Board Staff
- Hydro One Networks' July 23, 2007 Interrogatory
Responses to Powerline Connection
- Hydro One Networks' July 23, 2007 Interrogatory
Responses to Wellenreiter
- OEB
Decision and Order, August 20, 2007.
The second Bruce to Milton Early
Access Application for Camp Creek and Halton Hills refinement areas
was filed on December 6, 2007.
Regulatory Contacts:
| Mr. Glen MacDonald |
|
Ms. Anne-Marie Reilly |
Hydro One Networks
483 Bay Street
8th Floor, South Tower
Toronto, ON, M5G 2P5 |
|
Hydro One Networks
483 Bay Street
8th Floor, South Tower
Toronto, ON, M5G 2P5 |
| Tel: 416-345-5913 |
|
Tel: 416-345-6482 |
Back to Top
|
|