Before starting your application, please review our Fact Sheet, then follow the steps outlined below:

Read the Guidelines for a Prescriptive and Custom project, and decide which type of project would be the best fit for your business.

Download and complete the relevant Worksheets for your project, and read the qualifying lists for: Thermostats, Heat Pad Controllers, 24" Ventilation Fans.
 

Fill out the Application.
 

E-mail or courier your completed Application and all worksheets by December 31, 2008 to ERIP@HydroOne.com or Hydro One Networks, Conservation and Demand Management Program Office, 483 Bay Street, 14th Floor, Toronto, ON  M5G 2P5.

  Lighting Systems
  Motors
  Transformers
  Unitary A/C
  Agriculture Technology Worksheet
  Custom Project Calculation Sheet (Excel)

About the Program
Hydro One’s Electricity Retrofit Incentive Program provides business, farm and institutional customers of Hydro One Networks Inc. with an opportunity to realize their energy efficiency potential, and to receive attractive incentives to reduce the capital cost of energy efficient technologies.

The objective of the Electricity Retrofit Incentive Program is to initiate energy conservation and load management projects within the Commercial, Industrial, Agricultural and Institutional sectors by offering financial incentives.

For the business customers of Hydro One Networks, incentives are now available to assist in the implementation of conservation and demand management projects that will improve their bottom lines.

Timelines
Applications are accepted on a first-come, first-served basis. Customers applying for Custom Project Incentives must seek pre-approval. Customers applying for Prescriptive Incentives have an option of seeking funding approval prior to installation or post installation of the energy efficiency measure(s).

Although the OPA Guidelines state that ERIP deadlines are based on a three-year commitment, the contract between Hydro One Networks and the OPA for the delivery of the program is reviewed on a yearly basis. Hydro One Networks, therefore, recommends that customers apply for incentives based on the following deadlines, as funding is limited and the program may not be offered beyond 2008:

  • Applications submitted for pre-approval must be received by Hydro One Networks no later than December 31, 2008.
  • Applications submitted for Prescriptive incentives after project installation must be received by Hydro One Networks no later than December 31, 2008.
  • Projects must be completed and all supporting documentation received by Hydro One within 12 months of pre-approval.

Funding is limited and Hydro One Networks reserves the right to cancel the program at any time.

Who Qualifies?

  • All non-residential Hydro One Networks customers qualify. However, projects must have a minimum size to be eligible. Projects, motors excepted, must achieve a minimum incentive of $150 to qualify.
  • Applicants must be owners or tenants of business premises served by Hydro One Networks.
  • Please note that if you are a tenant, you must obtain permission from the property owner for installation of the measures for which an incentive is claimed.

Qualifying Projects
Incentives will be available for pre-approved projects that result in measurable reductions in electrical peak demand. These projects may be completed using energy-efficient, leading-edge technologies prescribed by Hydro One Networks or may be based on innovative, custom solutions.

Prescriptive Projects
Rebates are offered for pre-approved technologies on a per-unit or performance basis. Read additional information about qualifying Prescriptive Technologies.

An incentive is available for prescriptive projects (pre-approved technologies):

  • Energy-efficient lighting products
  • Unitary A/C units (up to 5 tons) that are ENERGY STAR® qualified/CEE compliant
  • Three-phase premium efficiency motors
  • Three-phase ENERGY STAR® Power Transformers

Custom Projects
All technology, equipment and systems are evaluated on the basis of their energy performance improvement. The incentive offered of $150/kW is based specifically on the level of improvement. Read additional information about qualifying Custom Projects.

How do I participate?
There are two ways to get started:

  1. Use the self-serve method by reviewing our Fact Sheet, then downloading the appropriate application form(s) and guideline(s) found at the top of this page. Mail or courier your completed application including all worksheet(s) to:
    Hydro One Networks
    Conservation and Demand Management Program Office
    483 Bay Street, 14th Floor
    Toronto, ON  M5G 2P5

     
  2. Contact Hydro One Networks via e-mail at ERIP@HydroOne.com.

 

[ Printable Version ]

All contents © 2008 Hydro One Networks Inc. All rights reserved.
Privacy and Terms of Use