Hydro One  Hydro OneHomeSearchSite MapContact UsIndustry Links
Hydro OneHydro One
About Hydro One Networks
Electrical Safety
Customers
Energy Efficiency Tips and Tools
Electricity Updates
Environment
In Your Community
Regulatory Affairs
Media Centre

Home > Energy Efficiency Tips & Tools

In this Section:
  » Program Details for Business Projects
  » Program Details for Farm Projects

Energy Efficiency Tips and Tools

When it’s time to retrofit your business, why not choose equipment that will save you money? With all the financial and timing considerations, energy-efficient options may not be the first thing on your mind. So we’ve made it easy for you. The Electricity Retrofit Incentive Program (ERIP) gives you the most energy-efficient solutions to improve your bottom line.

For details, download our Fact Sheet (PDF 606 KB). To apply, click on a button below:

Apply for a Business Project
Apply for a Farm Project
Rebates are offered for technologies on a per-unit or performance basis. Refer to the worksheets and Prescriptive Project Guidelines for more information about qualifying Prescriptive Technologies, such as:
  • Energy-efficient Lighting
  • Unitary A/C Units (up to 25 tonnes) that are ENERGY STAR®-qualified/CEE compliant
  • Three-phase premium efficiency motors
  • Three-phase ENERGY STAR® Power Transformers
  • Incentives are also available for agricultural fans, creep heat and controls.
Incentives will be available for pre-approved projects that result in measurable reductions in electrical peak demand. These projects may be completed using energy-efficient, leading-edge technologies specified by Hydro One or may be based on innovative, custom solutions.

The incentive offered at $150/kW is based specifically on the level of improvement. Refer to the Custom Project Guidelines for more information about eligibility.

Applicants must be owners or tenants of business premises served by Hydro One. Please note that if you are a tenant, you must obtain permission from the property owner for installation of the measures for which an incentive is claimed.

Although the OPA Guidelines state that ERIP deadlines are based on a three-year commitment, the contract between Hydro One Networks and the OPA for the delivery of the program is reviewed on a yearly basis. Hydro One Networks, therefore, recommends that customers apply for incentives based on the following deadlines, as funding is limited and the program may not be offered beyond 2008:

  • Applications submitted for pre-approval must be received by Hydro One Networks no later than December 31, 2008.
  • Applications submitted for Prescriptive incentives after project installation must be received by Hydro One Networks no later than December 31, 2008.
  • Projects must be completed and all supporting documentation received by Hydro One within 12 months of pre-approval.

For more information, see program details for business/institutional projects or farm projects, or e-mail ERIP@HydroOne.com.
 

 

[ Printable Version ]

All contents © 2008 Hydro One Networks Inc. All rights reserved.
Privacy and Terms of Use