Hydro One Hydro OneHomeSearchSite MapContact UsIndustry Links
Hydro OneHydro One
About Hydro One Networks
Electrical Safety
Customers
Energy Efficiency Tips & Tools
Electricity Updates
Environment
In Your Community
Regulatory Affairs
Media Centre
Careers

 

 

What's New
08/06/2008 - Hydro One and the IESO have developed a common application for the Customer Impact Assessment and System Impact Assessment as part of the Transmission Customer Connection Process

06/18/08 - Hydro One Transmission Rate Application

06/16/08 - Hydro One's Double Return Program





Learn more about the Double Return program


Home > Customers > LDCs & Transmission-connected

LDCs & Transmission-connected Customers

Hydro One is proud to supply electricity to more than 90 large transmission-connected industrial customers and 80 Local Distribution Companies (LDCs) across the province. Our Transmission-connected customers include pulp and paper mills, refineries, auto manufacturers, mining and steel companies. All of these customers have significant power requirements.

Programs
The following programs will assist LDCs and Transmission-connected customers manage their electricity supply connections with Hydro One. These have been developed in accordance with various regulations and Market Rules established in Ontario and the obligations they place on the participants. See below for a brief summary and links to more information about each program:

Wholesale Revenue Metering (Meter Exit Program)
All customers connected to the IESO control grid are responsible for their wholesale revenue metering. Each customer-owned metering installation must comply with the requirements and standards set out in Chapter 6 of the IESO Market Rules. Learn more.
Feeder Settings Program (PCMIS)
Hydro One has developed a program and software system to improve the management of feeder settings for Hydro One-owned Transformer Stations and breakers. The program clarifies the accountability of the Local Distribution Companies (LDCs) and the Transmitter (Hydro One). Learn more.
Power Quality Incident Reporting
Customer equipment can adversely affect the quality of electrical supply to another customer. Large motors, arc furnaces and a large number of non-linear loads can all contribute to Power Quality (PQ) disturbances. Hydro One responds to our customers' PQ issues through the Power Quality Inquiry Response Process. Learn more.
Unaccompanied Station Access Process
To ensure the utmost in public safety and security, Hydro One has developed a process to assist Transmission-connected LDCs with unaccompanied access to their equipment inside a Hydro One Transformer Station. Learn more.
LDC Work Program
Our LDC Work program manages the scheduling and implementation of requests for new or modified joint use of poles, long term load transfers, additional capacity, tie lines, power quality, new metering locations and reliability concerns. Learn more.
Outage Planning for Transmission-connected Customers
Hydro One as a Transmitter has a responsibility to maintain and repair equipment to ensure the safe and reliable delivery of electricity to our customers. Scheduling outages is critical to the performance of the Transmission system. Learn more.
Double Return programDouble Return Program
Reduce your company's average peak electricity demand by 5-10% over last year (between 7 a.m. and 7 p.m. on business days) and we'll pay you double the amount of what you save in delivery charges! All transmission-connected Hydro One customers are automatically enrolled in the program. Learn more.

Archived Bulletins

Read our archived customer bulletins and conference speeches below:

 

Network Operating
Login to our secure website to see your specific operating information, such as Customer Notification Bulletins, Briefings, Connection Agreements and more!

User ID:
Password: Secure Sign In


OGCC Weekly Reports - Download past issues below. Ontario Grid Control Centre Weekly Report - Archive OGCC Weekly Report - July 10 to July 16, 2008 OGCC Weekly Report - July 17 to July 23, 2008 OGCC Weekly Report - July 24 to July 30, 2008 OGCC Weekly Report - July 31 to August 6, 2008 OGCC Weekly Report - August 7 to August 13, 2008

Links
Directions: 2007 Transmission Status Report

Transmission Solutions 2005-2014

Hydro One Conditions of Service

Hydro One Regulatory Affairs

Independent Electricity System Operators (IESO)

Ontario Energy Board

Transmission System Code

Distribution System Code

 

[ Printable Version ]

All contents © 2008 Hydro One Networks Inc. All rights reserved.
Privacy and Terms of Use